Flozone Services | Maryland Live! focusing on environmental solutions to HVAC water treatment
16032
page-template-default,page,page-id-16032,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-theme-ver-14.4,qode-theme-bridge,wpb-js-composer js-comp-ver-5.4.4,vc_responsive

Maryland Live! focusing on environmental solutions to HVAC water treatment

Maryland Live! HVAC

Maryland Live! is one of the largest commercial casinos in the country focusing on environmentally friendly solutions to HVAC water treatment. Maryland Live! is conveniently located in the Washington DC/Baltimore corridor within Hanover, MD. In January of 2016, Flozone Services, Inc. (FSI) was contracted through Innovative Mechanical to install its environmentally-friendly water treatment system. The Flozone technology made an immediate impact on the casino’s sustainability objectives by reducing water and energy consumption.

 

The Flozone Integrated Management System (IMS) utilizes a non-chemical condenser water treatment protocol. The technology reduces water consumption and energy usage as well as eliminating hazardous chemicals associated with a traditional condenser water system. The E3 Sentinel monitoring and management system ensures that the IMS equipment operates at maximum efficiency.

 

FSI provides quality service by constantly managing the function of the IMS through monitoring. Innovative Mechanical’s superior field service team maintains the preventive measures to the IMS on location. This atmosphere of teamwork affords the customer with improved performance and increased utility and environmental savings.

Project Profile

Maryland Live Casino

Hanover, MD

3400 Tons HVAC Cooling

 

2018 Results:

 

  • Energy savings $11,921
  • kWH consumption reduced 198,680 KWH
  • kW Demand reduced 302 kW
  • Water & Sewer savings $35,592
  • Water & Sewer consumption reduced 4,676,955 gallons
  • Total Water, Sewer and Electric savings $47,513
  • Eliminated condenser water chemicals: 2,076 gallons
  • Carbon Footprint reduced 137 metric tons
  • Excellent corrosion rates are verified by corrosion coupon analysis by a third party.
  • Chiller efficiency increased from 85% to 95+%
  • Annual inspections of chillers reveal clean tubes and do not need brushing.
  • Long term savings in extended life of equipment is increased due to absence of harsh chemicals previously used.

 Total Facility Savings with Flozone Services Since February of 2016

 

Water & Sewer Reduced 14,936,901 gallons
kWH Reduced 527,425 kWH
kW Demand Reduced 756 kW
Condenser Chemicals Reduced 5,857 gallons
Carbon Footprint Reduced 363 metric tons

 

Maintenance & Extended Mechanical Life Savings $15,963
Water & Sewer Expense Savings $113,670
Energy Expense Savings $31,646
Total $161,279